LEGAL ACTS OF THE REPUBLIC OF LATVIA
home
 

Text consolidated by Valsts valodas centrs (State Language Centre) with amending regulations of:

20 September 2011 [shall come into force from 30 September 2011];
7 January 2014 [shall come into force from 10 January 2014].

If a whole or part of a paragraph has been amended, the date of the amending regulation appears in square brackets at the end of the paragraph. If a whole paragraph or sub-paragraph has been deleted, the date of the deletion appears in square brackets beside the deleted paragraph or sub-paragraph.


Republic of Latvia

Cabinet
Regulation No. 907

Adopted 28 September 2010

Regulations Regarding the Survey, Technical Servicing, Current Repairs and Minimal Requirements for Energy Efficiency of the Residential House

[20 September 2011]

Issued pursuant to
Section 6, Paragraph five of
the Law On Administration of Residential Houses

I. General Provisions

1. This Regulation prescribes:

1.1. the procedure and conditions for the performance of the survey, technical servicing and current repair of a residential apartment house (hereinafter - residential house), the facilities and communications located therein;

1.2. the minimal requirements for ensuring the energy efficiency of a residential house.

[20 September 2011]

2. The survey, technical servicing and current repair (hereinafter - repair) of a residential house, the facilities and communications located therein (hereinafter - engineering communications) shall be performed in order to ensure the maintenance (physical preservation) of the residential house throughout its operation and to prevent the occurrence of threats.

3. The technical condition of a residential house, the facilities and engineering communications located therein shall be determined by a visual inspection. The fact of the inspection shall be recorded in the Residential House Survey Registration Log.

[20 September 2011]

3.1 The administrator of a residential house which is divided into apartment properties shall visually inspect the facilities contained in the common property and the parts of the engineering communications located in separate properties in accordance with the procedure specified by the administration contract. If an apartment owner does not ensure the administrator with the opportunity of performing a visual inspection, this fact shall be recorded in the Residential House Survey Registration Log.

[20 September 2011]

4. Repairs shall be performed in order to ensure the continuous operation of the residential house, the facilities and the engineering communications located therein. The repairs may be:

4.1. an emergency repair - the timely rectification of damage referred to in this Regulation;

4.2. a planned repair - the rectification of damage within the time period specified by the residential house administrator.

[20 September 2011]

5. The proprietary border of a residential house, the facilities and the engineering communications located therein shall be determined by regulatory enactments or the contracts entered into by the residential house administrator and the relevant service provider.

II. Technical Servicing Intervals and Surveys of Residential Houses, the Facilities and the Engineering Communications Located Therein

6. The residential house administrator shall ensure the technical servicing, visual inspection, technical survey and rectification of the damages of the residential house, the facilities and the engineering communications located therein.

7. If the facilities and engineering communications belonging to other persons are located in a residential house, the residential house administrator cannot prevent the owner of the respective engineering communications from ensuring the technical servicing, visual inspection and technical survey thereof.

8. The manufacturer or regulatory enactments shall determine the technical servicing intervals and technical servicing operations of a residential house, the facilities and the engineering communications located therein. If the manufacturer's instructions are not available or the intervals and operations referred to are not determined by regulatory enactments, these shall be determined by the residential house administrator.

8.1 In order to use heating more effectively, as well as reducing payments, the residential house administrator shall monitor and regulate the heating regime depending on the time of day and the summer or winter season.

[20 September 2011 / Paragraph shall come into force on 1 January 2012. See Paragraph 24]

9. If the facilities and engineering communications belonging to other persons are located in a residential house, the technical servicing intervals and technical servicing operations thereof shall be determined by the owner of the respective facilities or engineering communications, unless otherwise prescribed by the manufacturer or regulatory enactments.

10. Within the scope of the visual inspection of land attached to a residential house, the following activities shall be performed:

10.1. on pavements and access roads, bridges, footbridges and stairs:

10.1.1. twice a year - the visual inspection of gutters;

10.1.2. twice a year - the visual inspection of the condition of coverings and edges;

10.2. on greenery:

10.2.1. twice a year - the visual inspection of the condition of tree foliage and roots;

10.2.2. twice a year - the visual inspection of the effect of greenery on the residential house, the facilities and the engineering communications thereof;

10.3. on fences, hedges, gates and supporting walls:

10.3.1. twice a year - the visual inspection of paintwork and other forms of treatment;

10.3.2. twice a year - a visual inspection in order to determine whether or not subsidence has occurred;

10.3.3. twice a year - a visual inspection in order to determine whether or not other damage has occurred;

10.4. twice a year - the visual inspection of the wastewater containers and individual wastewater treatment facilities, waste containers and the area or location thereof.

11. Within the scope of the preventive survey of the basic construction of a residential house and the buildings belonging thereto, the following activities shall be performed:

11.1. the visual inspection of the foundations in order to determine whether or not:

11.1.1. subsidence has occurred;

11.1.2. cracks have appeared;

11.1.3. the opening of joints between elements of the house (for example, the foundation blocks or panels) has occurred;

11.1.4. the plaster work has peeled away;

11.1.5. the cold and damp has caused damage;

11.2. the visual inspection of load-bearing walls, coverings and stairs in order to determine whether or not:

11.2.1. subsidence has occurred;

11.2.2. the opening of joints between elements of the house (for example, the foundation blocks or panels) has occurred;

11.2.3. deformities have occurred (for example, buckling, flexures);

11.2.4. damp or mould patches, damage caused by condensation or damage to paintwork have occurred;

11.3. a visual inspection of the roof and the roof overhang:

11.3.1. roof-bearing constructions;

11.3.2. roof covering;

11.3.3. roof joints;

11.3.4. roof hatches and junctions;

11.3.5. on the cleanliness of gutters;

11.4. the visual inspection of facade elements:

11.4.1. on facades, balconies, plinths and cornices;

11.4.2. on windows and doors, their frames, gaskets, locks, hinges, glazing or surface, as well as coverings of wood window and door frames;

11.5. the visual inspection of chimneys and flues, in order to determine whether or not cracks and damage caused by damp have occurred;

11.6. the visual inspection of cellar premises:

11.6.1. on walls, floors and ceilings in order to determine whether or not damp or mould stains or condensation have occurred;

11.6.2. in order to determine whether or not condensation has occurred on drainpipes or other structures in the cellar premises;

11.6.3. in order to determine whether water is seeping in.

[20 September 2011; 7 January 2014]

12. Once a year the visual inspection of the residential house and the floor, ceiling and wall surfaces of the internal premises belonging thereto shall be performed, in order to determine whether or not cracks, subsidence or condensation, or other mould promoting factors or mould fungi have occurred.

13. Once a month the visual inspection of the engineering communications shall be performed:

13.1. on the heating system;

13.2. on the water supply system;

13.3. on the drainage system;

13.4. on the ventilation system and air conditioning equipment;

13.5. on the gas supply system.

13.1 Within the scope of a visual inspection, a leakage test of the engineering communication entry points and the windows, doors, hatches, shafts and other facilities and elements in the common premises shall be performed, in order to determine whether or not damage or other circumstances leading to an escape of heat into the external environment has arisen. The visual inspection intervals for the winter and summer period shall be determined by the residential house administrator.

[20 September 2011 / Paragraph shall come into force on 1 January 2012. See Paragraph 24]

14. In addition to the inspections referred to in Paragraphs 10, 11, 12, 13, and 13.1 of this Regulation, a visual inspection shall also be performed following gales, floods, heavy precipitation, and other natural disasters which may cause damage to a residential house and the facilities and the engineering communications contained therein, as well as following emergency situations which may cause a threat.

[20 September 2011]

15. If damage to a residential house or the facilities and the engineering communications located therein are determined during a visual inspection, the administrator shall:

15.1. decide on the performance of emergency repairs, if any of the damages referred to in Paragraph 17 of this Regulation are determined;

15.2. decide on the arrangement for the performance of tasks for technical surveys, the performance of planned repairs and the additions to the administrative work plan or residential house renovation or reconstruction, if the residential house administrator is the residential house owner or administrator who is authorised to take such a decision;

15.3. prepare recommendations for the residential house owner (association of apartment owners) for the taking of the decision on the arrangement for the performance of tasks for technical surveys, the performance of necessary repairs and the additions to the administrative work plan or residential house renovation or reconstruction, if the residential house is managed by an administrator who is not authorised to take such a decision.

[20 September 2011]

15.1 If conditions which cause the escape of heat into the surrounding environment are determined during a visual inspection, the administrator shall ensure the performance of the measures referred to in Paragraph 23 of this Regulation for improving energy efficiency.

[20 September 2011 / Paragraph shall come into force on 1 January 2012. See Paragraph 24]

16. The technical survey of a building shall be performed if the average lifetime referred to in Annex 2 to this Regulation has passed since the residential house and the buildings (structures) belonging thereto were put into operation or in accordance with the relevant residential house solidity group (Annex 1) for the respective part of the building or built-in building wares.

16.1 The sample Residential House Survey Registration Log is indicated in Annex 3 to this Regulation.

[20 September 2011]

III. Time Periods for the Rectification of Damages to a Residential House, the Facilities and the Engineering Communications Located Therein

17. Emergency repairs shall be performed if the following damages to a residential house and the facilities and the engineering communications located therein are determined:

17.1. leaking of the roof covering;

17.2. damage to water downpipes, funnels, bends and the securing devices thereof;

17.3. there is no contact of the architectural elements of the facade or the bricks with the wall;

17.4. stratification of the plaster work or cornice elements;

17.5. the glass of windows or doors has been smashed or the window frame leaves have been removed;

17.6. instability of door leaves and closing devices;

17.7. leakages in the floor coverings in the sites of the sanitary facilities as a result of damage to the damp-proofing;

17.8. cracks and damage to stoves or flues, which may lead to the poisoning of persons by flue gases and threaten the fire safety of the house;

17.9. cracks and indensities in chimneys and the clamp sites thereof with stoves;

17.10. damage to pipes and the clamps thereof with fittings, armature and devices;

17.11. damage to the electricity supply cables of a residential house, which may cause interruptions to the electricity supply for lighting or cause malfunctions of devices and engineering communications;

17.12. damage to the heating system during the heating season;

17.13. damage to the gas supply system;

17.14. mould fungi and mould-promoting conditions;

17.15. other damage not referred to in this Paragraph, if regulatory enactments provide for the emergency rectification thereof or if they pose a significant threat;

17.16. damage to the damp-proofing of engineering communication inlets.

[20 September 2011]

18. The rectification of damages to a residential house, the facilities and the engineering communications thereof, which are not referred to in Paragraph 17 of this Regulation, shall be performed within a time period specified by the residential house administrator.

19. If circumstances are determined during a visual inspection or technical survey, which may cause the occurrence of damage, the residential house administrator shall perform the necessary measures for the rectification of the circumstances referred to.

IV. Requirements for Ensuring the Energy Efficiency of a Residential House

[20 September 2011]

20. The residential house administrator shall organise the installation of a meter for measuring the amount of thermal energy consumed, if such has not been installed for a residential house whose thermal energy is supplied by a person other than an energy supply merchant.

21. The residential house administrator shall plan measures for improving energy efficiency, including the changing of worn-out elements or constructions, if the average consumption of thermal energy of the residential house, in which thermal energy is used for heating of the residential house and preparation of hot water, within the last three calendar years exceeds 200 kWh/m2 per year or 150 kWh/m2 per year, if thermal energy is used for heating of the residential house only. In calculating the average consumption of thermal energy within the last three calendar years, the useful area to be heated in the building shall be taken into account.

[7 January 2014]

22. When planning the renovation of a residential house, the residential house administrator shall perform energy efficiency measures which:

22.1. ensure such reduction of the thermal energy consumption of the residential house, that the thermal energy consumption is lower than the thermal energy consumption level referred to in Paragraph 21 of this Regulation;

22.2. ensure a higher saving of thermal energy in relation to the funds required for the implementation of the measures.

[Paragraph shall come into force on 1 January 2012. See Paragraph 24]

23. If conditions which facilitate the escaping of heat into the surrounding environment are determined, the administrator shall perform the following measures to improve energy efficiency:

23.1. fit the exterior door with a closing mechanism;

23.2. provide thermal insulation for the heating system pipes and hot water pipes which are located in unheated premises;

23.3. equip the windows and external doors with sealant.

[Paragraph shall come into force on 1 January 2012. See Paragraph 24]

23.1 The administrator may decide on performance of energy certification of the residential house for planning of energy efficiency improvement measures.

[7 January 2014]

V. Closing Provision

[20 September 2011]

24. Paragraphs 8.1, 13.1, 15.1, 21, 22, and 23 of this Regulation shall come into force on 1 January 2012.

Prime Minister V. Dombrovskis

Minister for Economics A. Kampars

 

Annex 1
Cabinet Regulation No. 907
28 September 2010

Classification of Residential Houses into Solidity Groups According to the Materials Used, Constructions and Average Lifetime

Solidity group

Foundation construction, material

Material of load-bearing walls - frameless constructions; material of load-bearing frame constructions

Roof construction, material

Average lifetime of the residential house in years

Notes

I

Extra solid Stone wall, monolithic concrete and reinforced concrete, including on a plate, premanufactured element or pile foundation Stone (brick) or large blocks;

Columns and beams (cross-bars)

Monolithic reinforced concrete or metal beam with a monolithic concrete infill

150

 

II

Common Stone wall, monolithic concrete and reinforced concrete, including on a plate, premanufactured element or pile foundation Stone (brick), large block or large panel;

Columns and beams (cross-bars)

Monolithic reinforced concrete, reinforced concrete premanufactured or metal beam with monolithic reinforced concrete or a premanufactured infill

125

 

III

Light-weight type Stone wall, monolithic concrete and reinforced concrete, including on a plate, premanufactured element or pile foundation Stone (brick), large block or large panel Timber beam, metal beam with a brick wall vault infill, mixed construction

100

 

IV

Mass production buildings Monolithic concrete and reinforced concrete, including on a plate, premanufactured element or pile foundation Stone (brick) or large panel Reinforced concrete, premanufactured elements

70

Batches

1-316;

1-318;

119

V

Mass production buildings Monolithic concrete and reinforced concrete, including on a plate, premanufactured element or pile foundation Panel and large panel Reinforced concrete, premanufactured elements

60

Batches

103;

104;

1-464;

1-467A;

1-602;

602P

VI

Low-rise buildings Stone concrete, strip concrete Brick wall or timber framework building and log buildings Timber beam, reinforced concrete premanufactured elements, mixed construction

50

Batches M3;

M4

Note. The solidity group for family houses and summer houses shall be applied according to the technical nature thereof.

Minister for Economics A. Kampars

 

Annex 2
Cabinet Regulation No. 907
28 September 2010

Average Lifetime of Structural Elements, Finish and Engineering Appliances

[7 January 2014]

No.

Structural elements, finish and engineering appliances

Average standard lifetime in years depending on the house solidity

I

II

III

IV

V

VI

1

2

3

4

5

6

7

8

1. House elements

1.1. Foundations

1.1.1. Reinforced concrete pile

150

125

100

70

60

-

1.1.2. Timber pile, constantly submerged under water

150

125

100

-

-

-

1.1.3. Monolithic reinforced concrete slabs

150

125

100

-

-

-

1.1.4. Concrete and reinforced concrete premanufactured elements and monolithic strip

150

125

100

70

60

50

1.1.5. In a natural stone wall cement mortar - strip and post

150

125

100

-

-

50

1.1.6. In a natural stone wall lime mortar - strip and post

-

-

100

-

-

50

1.1.7. Brick wall strip and post

-

-

-

-

-

50

1.1.8. Timber chairs and ground plates

-

-

-

-

-

50

1.2. Walls and Frames

1.2.1. Frames

1.2.1.1. Monolithic reinforced concrete frames

150

125

-

-

-

-

1.2.1.2. Reinforced concrete premanufactured elements and steel frames

-

125

100

-

-

-

1.2.2. Walls

1.2.2.1. Monolithic reinforced concrete or concrete

150

125

-

-

-

-

1.2.2.2. Brick or hollow ceramic block wall, load-bearing walls of 2.5 bricks and thicker or non-bearing carcass infill wall

150

125

-

-

-

-

1.2.2.3. Brick or hollow ceramic block wall, load-bearing up to 2.5 bricks in depth

-

125

100

70

60

-

1.2.2.4. Light-weight brick or hollow ceramic block wall

-

-

100

-

-

-

1.2.2.5. Large panel load-bearing or non-bearing

-

-

-

70

60

-

1.2.2.6. Suspended panels

-

-

-

70

60

-

1.2.2.7. Small block, monolithic expanded-clay concrete or breeze concrete

-

-

100

-

-

-

1.2.2.8. Log buildings, lattice work or mixed (stone-timber) constructions

-

-

-

70

60

50

1.2.2.9. Timber framework or wooden panel buildings

-

-

-

70

60

-

1.2.2.10. Light-weight timber framework buildings

-

-

-

-

-

50

1.2.2.11. Premanufactured wall panel or block butt-joint

-

-

-

10

10

-

1.2.2.12. Brick wall and large panel external wall additional insulation of polystyrene with a thin layer of plaster rendering

40

40

40

40

40

-

1.2.2.13. Brick wall and large panel external wall additional insulation of rock wool with a thin layer of plaster rendering

40

40

40

40

40

-

1.2.2.14. Brick wall and large panel external wall additional insulation of polystyrene with cavity and sheet metal, stone slab cladding

75

75

75

70

60

-

1.2.2.15. Brick wall and large panel external wall additional insulation of rockwool with cavity and sheet metal, stone slab cladding

100

100

100

70

60

-

1.2.2.16. Wooden external wall additional insulation of polystyrene with a thin layer of plaster rendering

-

-

-

-

-

50

1.2.2.17. Wooden external wall additional insulation of rock wool with a thin layer of plaster rendering

-

-

-

-

-

50

1.2.2.18. Wooden external wall additional insulation of polystyrene with cavity and sheet metal cladding

-

-

-

-

-

50

1.2.2.19. Wooden external wall additional insulation of rock wool with cavity and sheet metal cladding

-

-

-

-

-

50

1.2.2.20. Monolithic reinforced concrete external wall insulation of polystyrene with a thin layer of plaster rendering

75

-

-

-

-

-

1.2.2.21. Monolithic reinforced concrete external wall insulation of rock wool with a thin layer of plaster rendering

100

-

-

-

-

-

1.3. Balconies, Loggias and Porches

1.3.1. Large-sized reinforced concrete slab loggias and balconies

100

100

60

50

60

-

1.3.2. Metal cantilever beam balconies

70

70

50

-

-

-

1.3.3. Porches with reinforced concrete and concrete steps

70

70

50

40

40

-

1.3.4. Porches with wooden steps

-

-

-

-

20

20

1.4. Coverings

1.4.1. Monolithic reinforced concrete

150

125

100

-

-

-

1.4.2. Reinforced concrete premanufactured decks in buildings with walls of 2,5 bricks and thicker

150

125

-

-

-

-

1.4.3. Reinforced concrete premanufactured decks in buildings with walls of up to 2,5 bricks thick

-

125

100

70

-

-

1.4.4. Reinforced concrete premanufactured coverings in large panel buildings and in buildings with light-weight stone walls

-

-

-

70

60

-

1.4.5. Stone, concrete or reinforced concrete vaults

150

125

100

-

-

-

1.4.6. Reinforced concrete small-sized premanufactured element or monolithic premanufactured element coverings

150

125

100

-

-

-

1.4.7. Metal beam coverings with reinforced concrete premanufactured elements, monolithic reinforced concrete, concrete or stone vault infill

-

125

100

-

-

-

1.4.8. Plastered metal or timber beam mezzanine floor coverings with a timber construction infill beneath the residential premises and auxiliary premises

-

60

60

-

-

-

1.4.9. Plastered metal or timber beam mezzanine floor coverings with a timber construction infill beneath the sanitary facilities and kitchens

-

30

30

-

-

-

1.4.10. Plastered metal or timber beam attic coverings with a timber construction infill

-

30

30

-

-

-

1.4.11. Non-plastered light-weight construction timber beam coverings

-

-

-

-

-

50

1.4.12. Additional insulation of polystyrene for attic covering

70

70

70

70

60

50

1.4.13. Additional insulation of rock wool for attic coverings

100

100

100

70

60

50

1.4.14. Additional insulation of polystyrene for cellar coverings (cellar ceiling), passages

60

60

60

60

60

-

1.4.15. Additional rock wool insulation for cellar coverings (cellar ceilings), passages

70

70

70

70

60

-

1.5. Load-bearing Roof Elements

1.5.1. Reinforced concrete premanufactured element decks

150

125

100

70

60

-

1.5.2. Reinforced concrete and metal load-bearing premanufactured elements (for example, rafters, purlins)

100

100

100

70

-

-

1.5.3. Timber load-bearing elements (for example, rafters, roof structure, purlins, roof boarding, sheathing)

100

100

80

70

-

50

1.6. Roof Covers

1.6.1. Corrugated and flat asbestos-cement sheets

-

40

40

40

-

40

1.6.2. Fibrous cement sheets

80

80

80

-

-

50

1.6.3. Corrugated synthetic material sheets

-

-

50

-

-

50

1.6.4. Corrugated bituminous material sheets

-

-

40

40

-

40

1.6.5. Clay tiles

150

125

100

-

-

50

1.6.6. Concrete tiles

90

90

90

-

-

50

1.6.7. Rolls of damp-proof course in 3-4 layers

-

25

25

25

25

-

1.6.8. Rolls of damp-proof course in 1-2 layers

-

-

15

-

-

-

1.6.9. Rubberised bitumen (shingle) covers

-

50

50

-

-

50

1.6.10. Reinforced mastic covers

-

30

30

30

30

-

1.6.11. Unreinforced mastic covers

-

15

15

15

15

-

1.6.12. Smooth galvanised sheet metal covers

40

40

40

40

-

40

1.6.13. Smooth black sheet metal covers

-

-

20

-

-

20

1.6.14. Fluted large-sized steel sheet covers

50

50

50

-

-

50

1.6.15. Fluted small-sized steel element (for example, tile) covers

40

40

40

-

-

40

1.6.16. Reed and straw covers

-

125

100

-

-

50

1.6.17. Chipboard, shingle and board covers

-

-

30

-

-

30

1.6.18. Sheet metal cover finishing coat (non HAMMERIT type)

-

10

10

10

-

10

1.6.19. Pitched roof snow barriers

30

30

30

30

-

30

1.7. Roof Drainage System

1.7.1. External plastic channels and drainage pipes

50

50

50

50

-

50

1.7.2. External industrially coated channels and drainage pipes, facade overhang covers

50

50

50

50

-

50

1.7.3. External galvanised sheet metal channels and drainage pipes, facade overhang covers

35

35

35

35

-

35

1.7.4. Internal cast iron drainage pipes

60

60

60

60

60

50

1.7.5. Internal polymer material drainage pipes

70

70

70

70

60

50

1.7.6. Channel and drainage pipe electric heating systems

20

20

20

-

-

20

1.8. Stairs

1.8.1. Monolithic reinforced concrete (load-bearing section)

150

125

100

-

-

-

1.8.2. Reinforced concrete premanufactured element (load-bearing section)

150

125

100

70

60

-

1.8.3. Reinforced concrete, concrete step to reinforced concrete and metal stringers (load-bearing section)

100

100

100

-

-

-

1.8.4. Reinforced concrete, concrete, stone, brick wall step (surface)

70

70

70

70

60

-

1.8.5. Timber constructions in the section above ground

-

40

40

-

-

50

1.8.6. Timber constructions in cellars

-

30

30

-

-

40

1.9. Partition Walls

1.9.1. Convertible

50

50

50

-

-

50

1.9.2. Reinforced concrete

-

-

-

70

60

-

1.9.3. Brick wall, concrete and ceramic block

150

125

100

70

-

-

1.9.4. Glass block or fluted glass

70

70

70

-

-

-

1.9.5. Gypsum concrete large panel, gypsum concrete or aerated concrete panels or blocks

-

70

70

70

60

-

1.9.6. Wooden panel and timber, plastered, between rooms

-

50

50

-

-

50

1.9.7. Wooden panel and timber, plastered, in sanitary facilities and kitchens

-

20

20

-

-

20

1.9.8. Timber frame, panelled, blocked

-

40

40

-

-

40

1.9.9. Metal frame, with gypsum board sheet panelling

50

50

50

50

50

50

1.10. Floors

1.10.1. Concrete screed

-

50

50

50

50

-

1.10.2. Cement screed

-

30

30

30

30

30

1.10.3. Teraco screed

60

60

60

-

-

-

1.10.4. Brick screed

-

-

-

-

-

50

1.10.5. Mastic (polyvinylacetate)

15

15

15

70

60

-

1.10.6. Mastic (for example, polyester, polyurethane)

20

20

20

20

-

-

1.10.7. Cement, ceramic and stone mass tiles

70

70

70

70

60

50

1.10.8. Polymer material tiles (for example, polyvinylchloride)

-

10

10

10

10

10

1.10.9. Linoleum or rubber linoleum

20

20

20

20

20

20

1.10.10. Timber boarding on soils

-

20

20

-

-

20

1.10.11. Timber boarding on coverings

30

30

30

-

-

30

1.10.12. Gypsum board floor foundations

70

70

70

70

60

50

1.10.13. Fibre board panels

-

-

15

15

15

15

1.10.14. Chipboard slab floor foundations

40

40

40

40

40

40

1.10.15. Parquetry floor panels

80

80

80

70

60

50

1.10.16. Parquet blocks, mosaic parquet or parquet panel, hardwood laminate parquet

70

70

70

70

60

50

1.10.17. Laminate parquet

25

25

25

25

25

25

1.10.18. Plywood floor foundations

40

40

40

40

40

40

1.10.19. Carpet-type - textile

15

15

15

15

15

15

1.11. Heating Devices

1.11.1. Fixed and Central Heating Devices

1.11.1.1. Stoves with solid heating fuel

100

100

100

70

60

50

1.11.1.2. Fireplaces with solid heating fuel

100

100

100

70

60

50

1.11.1.3. Ranges with solid heating fuel

50

50

50

-

-

50

1.11.1.4. Ranges with heating wall and solid heating fuel

50

50

50

-

-

50

1.11.1.5. Floor heating system with polymer material pipes

40

40

40

40

40

-

1.11.1.6. Floor electric heating cable system

40

40

40

40

40

-

1.11.2. Portable Heating Devices

1.11.2.1. Portable ranges, stoves and fireplaces with solid heating fuel

-

20

20

20

20

20

1.12. Windows and Doors

1.12.1. Wood frame windows and balcony doors

20

20

20

20

20

20

1.12.2. PVC windows in plastic frames

20

20

20

20

20

20

1.12.3. PVC windows in glued wood frames

20

20

20

20

20

20

1.12.4. PVC windows in aluminium/wood frames

20

20

20

20

20

20

1.12.5. Doors in apartment premises

40

40

40

40

40

40

1.12.6. Entry doors of apartments

40

40

40

40

40

40

1.12.7. External wood doors of houses

30

30

30

30

30

30

1.12.8. External steel doors of houses

50

50

50

50

50

50

1.12.9. External PVC doors of buildings in plastic frames

10

10

10

10

10

10

1.12.10. External PVC doors of buildings in aluminium frames

25

25

25

25

25

25

1.12.11. Closing mechanisms for external doors

15

15

15

15

15

15

1.12.12. Garage doors

-

-

-

-

-

30

1.13. Interior Finish

1.13.1. Wall surface plaster

60

60

60

50

50

-

1.13.2. Timber surface plaster - walls, ceilings on a wooden lath lattice

40

40

40

-

-

40

1.13.3. Ceramic tile finish

60

60

50

50

50

50

1.13.4. Gypsum board sheet finish

30

30

30

30

30

30

1.13.5. Paintwork with water colours

5

5

5

5

5

5

1.13.6. Paintwork with emulsion paints

7

7

7

7

7

7

1.13.7. Paintwork with oil or synthetic paints, enamels and varnishes

10

10

10

10

10

10

1.13.8. Finish with wallpaper or textile

10

10

10

10

10

10

1.14. External Finish

1.14.1. Natural stone finish

150

125

100

-

-

-

1.14.2. Finish with cement (MINERIT type) or ceramic plates

-

70

70

70

60

-

1.14.3. Finish with carpet mosaic tiles

-

30

30

30

30

-

1.14.4. Terrazzo plaster

70

50

50

-

-

-

1.14.5. Brick wall finish in gauged mortar

70

50

50

50

-

-

1.14.6. Brick wall finish in lime mortar

-

50

50

-

-

-

1.14.7. Stone or finish lime paint

-

20

20

-

-

-

1.14.8. Stone or finish silicate paint

20

20

20

-

-

-

1.14.9. Stone or finish polymer paint

20

20

20

-

-

-

1.14.10. Stone or finish silicone-treated paint

25

25

25

-

-

-

1.14.11. A thin layer of plaster on lath along the external layer of effective thermal insulation

40

40

40

30

30

-

1.14.12. Wooden surface oil paint (on southern facades)

3

3

3

3

3

3

1.14.13. Wooden surface oil paint (on northern facades)

10

10

10

10

10

10

2. Engineering Communications and Associated Engineering Installations

2.1. Cold Water-Pipe and Sewerage

2.1.1. Galvanised tube piping (with threaded sockets) (galvanised sockets are not recommended)

30

30

30

30

30

30

2.1.2. Piping from black steel gas pipes

15

15

15

15

15

15

2.1.2.1. Multi-layer piping

15-20

15-20

15-20

15-20

15-20

15-20

2.1.2.2. Plastic piping (with chlorine elements)

15-20

15-20

15-20

15-20

15-20

15-20

2.1.3. Sewerage piping with cast iron pipe fittings

60

60

60

60

60

60

2.1.4. Sewerage piping with plastic pipe fittings

70

70

70

70

70

70

2.1.5. Toilet taps

30

30

30

30

30

30

2.1.6. Ceramic washbasins

30

30

30

30

30

30

2.1.7. Ceramic toilets, bidets

30

30

30

30

30

30

2.1.8. Flushing cisterns

150

125

100

70

60

50

2.1.9. Polymer material baths

30

30

30

30

30

30

2.1.10. Enamelled cast-iron baths

60

60

60

60

60

60

2.1.11. Enamelled metal baths

50

50

50

50

50

50

2.1.12. Shower cabins with enamelled metal trays

30

30

30

30

30

30

2.1.13. Dishwashers and stainless steel kitchen sinks

40

40

40

40

40

40

2.1.14. Cast iron dampers and valves

40

40

40

40

40

40

2.1.15. Brass valves

40

40

40

40

40

40

2.2. Hot-Water Pipe

2.2.1. Galvanised piping systems (only with threaded sockets) with a vent and water filtration (galvanised pipes not recommended)

20

20

20

20

20

20

2.2.2. Galvanised piping systems (only with threaded sockets) without water preparation (galvanised pipes not recommended)

15

15

15

15

15

15

2.2.2.1. Multi-layer piping

15-20

15-20

15-20

15-20

15-20

15-20

2.2.2.2. Plastic piping (with chlorine elements)

15-20

15-20

15-20

15-20

15-20

15-20

2.2.2.3. Black steel gas pipes

10

10

10

10

10

10

2.2.3. Mixing valves (globe)

30

30

30

30

30

30

2.2.4. Towel airers (galvanised piping, nickel-plated, only with threaded sockets, on hot water pipes)

30

30

30

30

30

30

2.2.5. Cast iron dampers and valves            
2.2.6. Brass valves and cone-shaped taps

40

40

40

40

40

40

2.2.7. Bath stoves (with solid heating fuel)

25

25

25

25

25

25

2.3. Central Heating

2.3.1. Radiators (cast iron)

50

50

50

50

50

50

2.3.2. Calorifers in stairwells

40

40

40

40

40

-

2.3.3. Convectors

40

40

40

40

40

40

2.3.4. Risers

40

40

40

40

40

40

2.3.4.1. Heating element connection leads, copper risers

50

50

50

50

50

50

2.3.4.2. Heating element connection leads, multi-layer risers

50

50

50

50

50

50

2.3.5. Main pipelines (polymer material)

50

50

50

50

50

50

2.3.6. Internal main pipes, steel, industrially insulated

50

50

50

50

50

50

2.3.7. Main pipelines (polymer material)

50

50

50

50

50

50

2.3.8. Pipe insulation (rock wool)

50

50

50

50

50

50

2.3.9. Dampers

40

40

40

40

40

40

2.3.10. Valves

40

40

40

40

40

40

2.3.11. Individual heating unit heat exchanger

40

40

40

40

40

40

2.3.12. Individual heating unit hot water heat exchanger

40

40

40

40

40

40

2.3.13. Individual heating unit automatic regulating device

40

40

40

40

40

40

2.4. Premise Vents and Ventilation

2.4.1. Electric fans

40

40

40

40

40

40

2.4.2. Vent channels (in walls)

100

100

70

70

60

50

2.4.3. Fixed conditioners

40

40

40

40

40

40

2.4.4. Ventilation air pipes, tin, industrially manufactured

50

50

50

50

50

50

2.5. Dry Waste Pipes

2.5.1. Waste shafts, valves, dampers

-

-

-

30

30

-

2.5.2. Waste collection chamber

-

-

-

70

60

-

2.5.3. Ventilation

-

-

-

30

30

-

2.5.4. Shaft

-

-

-

70

60

-

2.6. Natural Gas and Liquid Gas Installations

2.6.1. Natural gas pressure reduction device

50

50

50

50

50

50

2.6.2. Internal piping

50

50

50

50

50

50

2.6.3. Gas ranges

20

20

20

20

20

20

2.6.4. Gas water heaters

15

15

15

15

15

15

2.6.5. Gas heating devices

20

20

20

20

20

20

2.7. Electric Installations

2.7.1. Electricity supply inlet switching station devices

40

40

40

40

40

40

2.7.2. Main electricity supply copper cables

40

40

40

40

40

40

2.7.3. Apartment electricity supply copper cables

40

40

40

40

40

40

2.7.4. Electricity supply for the stand-by lighting in communal premises

30

30

30

30

30

30

2.7.5. Manufacturing and technical premises lighting supply

40

40

40

40

40

40

2.7.6. Elevator and hoist mains supply

30

30

30

30

30

30

2.7.7. Mains supplies for built-in appliances

40

40

40

40

40

40

2.7.8. Household electric ranges

30

30

30

30

30

30

2.8. Low-Intensity Current Devices

2.8.1. Supply installation for house internal communications and security, fire-fighting and alarms

30

30

30

30

30

30

2.8.2. Supply installation for house internal communications and security, sensors, measuring devices etc.

30

30

30

30

30

30

2.8.3. Intercom supply installation

30

30

30

30

30

30

2.8.4. Intercom elements in apartments

30

30

30

30

30

30

2.8.5. Portable intercom elements (by entrances)

30

30

30

30

30

30

2.8.6. Electric switches for intercom installations

30

30

30

30

30

30

2.8.7. Building management system (BMS)

50

50

50

50

50

50

2.9. Passenger Elevators

2.9.1. Passenger elevators

30

30

30

30

30

-

2.10. External Water Pipe, Sewerage and Heating Supply Engineering Networks

2.10.1. Water pipe inlet, cast iron pipes

40

40

40

40

40

40

2.10.2. Water pipe inlet, steel pipes

40

40

40

40

40

40

2.10.3. Water pipe inlet, polymer material pipes

50

50

50

50

50

50

2.10.4. Courtyard household, rainwater drainage system and building sewer, cast iron pipes

40

40

40

40

40

40

2.10.5. Courtyard household, rainwater drainage system and building sewer, ceramic, polymer material or asbestos-cement pipes

50

50

50

50

50

50

2.10.6. Draw-off taps

35

35

35

35

35

35

2.10.7. Centralised heating supply circuit

35

35

35

35

35

35

2.10.8. Courtyard gas pipe

50

50

50

50

50

50

2.10.9. Foundation drainage

50

50

50

50

50

50

2.11. External Landscaping

2.11.1 Bituminous concrete covering of roads

20

20

20

20

20

20

2.11.2. Bituminous concrete covering of pavements, covering along the building perimeter

20

20

20

20

20

20

2.11.3. Areas and footpaths with gravel covering

10

10

10

10

10

10

2.11.4. Areas and footpaths with concrete tile covering

35

35

35

35

35

35

Note. The average standard lifetime of a residential house, the constructive elements, finish and engineering appliances thereof is indicated in normal operational conditions. The average standard lifetime of elements, finish and engineering appliances subject to an aggressive environment shall be applicable by coefficient 0.8 - in a weakly aggressive, 0.6 - in an average aggressive and 0.4 - in a very aggressive environment.

Minister for Economics A. Kampars

 

Annex 3
Cabinet Regulation No. 907
28 September 2010

Residential House Survey Registration Log

[20 September 2011]

No.

Date of survey

Object to be surveyed (residential house or part thereof, name of installation or element, type of engineering communication)

Survey result

Activities required for the rectification of damages (if damages have been determined)

Surveyor (name of the legal person or given name, surname of the natural person)

Signature

             

 


Translation © 2016 Valsts valodas centrs (State Language Centre)

 
Document information
Status:
In force
in force
Issuer: Cabinet of Ministers Type: regulation Document number: 907Adoption: 28.09.2010.Entry into force: 02.10.2010.Publication: "Latvijas Vēstnesis", 156 (4348), 01.10.2010.
Language:
Related documents
  • Amendments
  • Issued pursuant to
  • Annotation / draft legal act
  • Explanations
218831
{"selected":{"value":"10.01.2014","content":"<font class='s-1'>10.01.2014.-...<\/font> <font class='s-3'>Sp\u0113k\u0101 eso\u0161\u0101<\/font>"},"data":[{"value":"10.01.2014","iso_value":"2014\/01\/10","content":"<font class='s-1'>10.01.2014.-...<\/font> <font class='s-3'>Sp\u0113k\u0101 eso\u0161\u0101<\/font>"},{"value":"01.01.2012","iso_value":"2012\/01\/01","content":"<font class='s-1'>01.01.2012.-09.01.2014.<\/font> <font class='s-2'>V\u0113sturisk\u0101<\/font>"},{"value":"30.09.2011","iso_value":"2011\/09\/30","content":"<font class='s-1'>30.09.2011.-31.12.2011.<\/font> <font class='s-2'>V\u0113sturisk\u0101<\/font>"},{"value":"02.10.2010","iso_value":"2010\/10\/02","content":"<font class='s-1'>02.10.2010.-29.09.2011.<\/font> <font class='s-2'>Pamata<\/font>"}]}
10.01.2014
87
0
Saite uz tiesību aktuAtsauce uz tiesību aktu
 
0
Vēstnesim 100 About Likumi.lv
News archive
Useful links
Contacts
For feedback
Terms of service
Privacy policy
Cookies
RSS logo
Latvijas Vēstnesis "Everyone has the right to know about his or her rights."
Article 90 of the Constitution of the Republic of Latvia
© Official publisher "Latvijas Vēstnesis"